Osseo 100+

Search Dental Tribune

Osseo 100+

save

NSK Middle East - United Arab Emirats

save

Removes Doubt

Osseo 100 measures implant stability and osseointegration to support decision on when to load an implant. Especially important when working with shorter treatment time or managing risk patients.
The uncomplicated procedure that measures ISQ allows the implant loading period to be planned in advance. The reconstruction of crowns and bridges can be monitored to optimize timing to decrease the risk for failures. Measurements can be made without unnecessary impact since the equipment does not come into physical contact with the implant or abutment.

3-step Procedure

1. The MulTipeg™ is attached to the implant. It screws effortlessly into the implant’s internal threads. (approximately 6-8 Ncm of torque).

2. Just aim for the magnet on top of the MulTipeg™. Non-invasive, objective, accurate and repeatable. The peg is responding by magnetic pulses and vibrates due to the stiffness in the contact area between the bone and the implant surface.

3. An ISQ value is generated and shown on the display. This reflects the level of stability on the universal ISQ scale – from 1 to 99. The higher the ISQ value, the more stable the implant.

For more info on the product, visit: https://www.nsk-dental.com/products/surgical/surgical-osseo100/

advertisement
advertisement